Gas bank is designed and built with compliance to IS: 6044_Part 1 standards
No PESO License required up to 8000 kg (8 MT) connected load
Constant Mass flow. Ideal for Industrial applications.
Higher LPG off-take flow rate more than 30 kg/hr from single cylinder enhances the capacity to meet high peek loads for 24×7 applications and 60% relatively less Footprint Area.
High-Cost saving compared to Liquide fuels due to higher Net Calorific value of LPG
LPG is a Green fuelresults inreduction in carbon footprints
End To End Solution
LOT BankCAPEX investment by Urja Energy Solutions.
Long term mutual agreement on LPG supply.
Based on hourly consumption LPG Bank design in accordance with IS 6044.
Installation& Commissioning by trained work force.
In detail training to customer personnel on operation and safety of LOT bank.
Standard AMC for contract period which includes periodic checking and testing as defined by the OMCand as per IS 6044_2018 Part 1.
Uninterrupted LPG supply by dedicated logistic service for each project.